Bashtanka multidisciplinary hospital purchases equipment for rehabilitation
-
12:10, 23 February, 2024
Bashtanka multidisciplinary hospital announced a tender for the purchase of medical equipment for rehabilitation — a treadmill with an arch.
This is evidenced by the data of the ProZorro public procurement system, NikVesti reports.
The rehabilitation treadmill is a special exercise machine designed for the physical rehabilitation of patients with orthopedic and neurological diseases.
The customer planned 1 million 550 thousand hryvnias for medical equipment. The winner of the tender must deliver the rehabilitation equipment to the medical institution by March 31 of this year.
Among the main characteristics of the track:
- The maximum load is not less than 200 kilograms;
- The presence of a safety arch with a chest belt to prevent falling;
- Safety vests of three different sizes;
- Ramp (lift) for a wheelchair.
The equipment must be new with a minimum 12-month warranty. The tender auction is scheduled for March 1.
Restoration of Bashtanka Hospital after shelling
We will remind you that the Bashtanka multidisciplinary hospital came under rocket fire on April 19, 2022. As a result of the attack, the polyclinic building was damaged, and two departments of the hospital were partially damaged.
Earlier, a tender was announced for the repair of the roof of one of the hospital buildings.
In June, the Cabinet of Ministers allocated 45.3 million hryvnias for the reconstruction of the building of the medical building of the Bashtanka Multidisciplinary Hospital. Another 86.8 million hryvnias are planned to be allocated to the reconstruction of the polyclinic.
In September, the department of town planning, architecture, capital construction and support of development projects of the Mykolayiv RMA announced a tender for the reconstruction of the building of the medical building of the Bashtanka multidisciplinary hospital. The works were estimated at 139 million 733 thousand 800 hryvnias.
So, in general, the Mykolaiv State Administration will spend 311 million hryvnias on the reconstruction of the hospital in the city of Bashtanka, but the prices of building materials turned out to be higher than the market prices.
It was also reported that, thanks to cooperation with the German Society for International Cooperation (GIZ), the surgical department of the multidisciplinary hospital in Bashtanka has been restored.