The director of the lyceum in Bereznehuvate about the largest shelling at the beginning of the war: «The territory was hit with five rockets»
-
16:38, 12 March, 2024
The lyceum in the village of Bereznehuvate, which was bombed by the Russian invaders at the beginning of the full-scale invasion, is not subject to restoration. Five rockets flew over the territory of the facility.
This was reported by NikVesti in the report «Life in communities».
Lyceum director Halyna Rudchyk said that the destruction of the school is so serious that the building must be demolished.
In the report, the director of the institution also took the journalists through the offices of the school, where the children studied, and showed the state of their destruction.
«As you can see, the building is completely destroyed. We counted five rockets that hit the territory of the school and completely destroyed it. Such destruction was caused that cannot be restored by capital construction. In the building of the elementary school, next to the study room, we had a bedroom for first-graders and a playroom where the groups of the extended day were located,» says Halyna Rudchyk.
The headmistress of the school says that several rockets hit the elementary building of the school, geography and history classrooms.
In the summer of 2023, it became known that the lyceum damaged by shelling in Bereznehuvate will be demolished and a new one will be built: project documentation will cost 9.6 million hryvnias.
They are planning to build a new lyceum with 33 classes for 1,104 children, a dormitory, which will be built into the lyceum complex. Also, the design and estimate documentation provides for two garages for school buses, stadium under-stand rooms, engineering facilities (fireplace gas, transformer substation existing). The project will also include already existing sites, comprehensive improvement and fencing of the territory.
In total, 199 million 492 thousand 388 hryvnias are planned for the new construction of the Bereznehuvate Lyceum. This is one of the 12 objects of Mykolaiv Oblast that were damaged as a result of Russian aggression, which claim 1 billion 960 million hryvnias from the Fund for liquidation of the consequences of armed aggression.
We will remind that more than 26 million hryvnias are planned to be spent on the overhaul of the Berezneguvat Gymnasium No. 1 of the Bashtanka district. The technical documentation states that the builders must repair the ceilings, walls and roof. We are also talking about the repair of bathrooms with the installation of the necessary equipment, arrangement of sewers, installation of new doors, etc. In addition, the educational institution provides an evacuation management system. At the end, the contractor has to prepare the area and plant trees and bushes. All works should be completed by the end of 2025.