₴9 million is planned to be spent on the overhaul of two streets in the Korabelnyi district of Mykolaiv

Illustrative photo of road repair, «NykVesty" Illustrative photo of road repair, «NykVesty"

In the Korabelnyi district of Mykolaiv, they plan to overhaul part of Kalynychenko Street and part of Rodynna Street — they plan to spend 9 million 82 thousand hryvnias on the repair work.

The corresponding tenders are published on the website of the public procurement system Prozorro.

A screenshot from the Google map of the section of Rodynnaya Street that will be repaired A screenshot from the Google map of the section of Rodynnaya Street that will be repaired

Major repair of 2.5 kilometers of road surface along Rodynna Street in the Ship district of Mykolaiv is planned to be carried out from Simferopolska Street to Rybna Street with an expected cost of 5.1 million hryvnias.

Major repairs include dismantling the pavement, cleaning it, arranging a pavement made of fine-grained asphalt concrete mixture, arranging sidewalks and ramps, installing road signs and applying horizontal markings.

The process of submitting tenders continues until January 23, and the auction will be held the next day.

It is also planned to overhaul the road along Kalynychenko Street from Simferopolska Street to Rybna Street for 3.9 million hryvnias.

A screenshot from the Google map of the section of Kalynichenko Street that will be repaired A screenshot from the Google map of the section of Kalynichenko Street that will be repaired

In turn, the overhaul of 1.9 kilometers of Kalynychenko Street includes preparatory work for uprooting two tree stumps, demolition of two trees and pruning of 12 trees. In addition, the contractor must dismantle the old pavement, lay new asphalt, arrange sidewalks, install road signs and apply horizontal markings.

Bids will be accepted until January 21, and the auction is scheduled to begin on January 22.

The contractor must start street repair work within 3 days after signing the contract. The warranty period for the road surface will be 10 years.

We would like to remind you that in October 2023, in the Korabelnyi district of Mykolaiv, work began on the major renovation of the square near the administrative building for the arrangement of a barrier-free space for the Center for the provision of administrative services. The renovation of the square was planned to be completed by the end of December 2023.

View full version