The shelter will be repaired for ₴6.8 million in order to resume offline education at the lyceum in the Mykolaiv region
- Olena Kozubovska
-
•
-
12:22, 09 May, 2024
In the village of Novofedorivka, Kobleve community, Mykolaiv region, they plan to overhaul the anti-radiation shelter for 6.8 million hryvnias.
The corresponding tender was published in the public procurement system ProZorro, NikVesti reports.
The customer of the works is the department of education, youth and sports of the Kobleve village council. The winner of the tender must dismantle the old structures of the basement, strengthen it with a metal frame. Accordingly, perform general construction work, cover walls and floors, install doors. The tender also provides for the development of the sewage system (installation of toilets), heating, lighting and ventilation. The work should be completed by August 31 of this year.
According to the information published on the «Dream.Proekty» platform, it is about the shelter in the basement of the Novofedorivka Lyceum. It states that the storage facility will be designed for 150 people, which provides the possibility of sheltering 100% of the participants of the educational process and other employees of the institution.
«The main goal is to create conditions for the institution's work in a face-to-face format to provide children with high-quality and affordable education,» says the project description.
According to the project, the room should be provided with: places to sit — chairs, places to lie down; containers with drinking (at the rate of 2 liters per day per person) and technical water. Places for storing food, a microwave for heating food, and trash cans should also be arranged.
Previously, the Department of Education had already announced a tender for the preparation of design and estimate documentation for this object and the examination of the construction project.
The situation with shelters in Mykolaiv
This is not the first situation with shelters closed during an air raid in Mykolaiv. Shelters in the Matviivka neighborhood, in the Central district of the city, and in the Yunist park were also closed during the strikes on Mykolaiv on March 17. After these cases, the mayor of Mykolaiv, Oleksandr Sienkevych, called on the residents to call the police if the shelter or storage room is locked during an air raid.
In general, Mykolaiv was on the list of regions with the worst shelter conditions. After inspecting the condition of the shelters throughout Ukraine, the NSDC recognized the unsatisfactory performance of the shelters for use in a number of regions and cities, in particular — Mykolaiv. After that, the mayor dismissed Oleksandr Herasymenia, the head of the department for emergency situations and civil protection of the population. And the first deputy mayor Vitalii Lukov was reprimanded.
Vitalii Kim, the head of Mykolaiv RMA, specified that 69% of abandoned shelters in the region are located in Mykolaiv. At the same time, almost half of the city's residents (47%) rated the condition of bomb shelters in the city as terrible or bad.
Back in May 2023, more than 70 million hryvnias were allocated from the budget of Mykolaiv for the repair and equipping of shelters. However, it turned out that the city budget will not receive funds from the 102 million hryvnias allocated by the state for the repair of shelters in schools and kindergartens of the region. And at the end of August 2023, the head of RMA Vitaii Kim said that he was dissatisfied with the shelters in the schools of the region.
Head of the Department of Education of the Mykolaiv City Council, Hanna Lychko, reported that shelters are being repaired in 21 schools in the city, and another 9 are at the planning stage. At the same time, the city council announced that by the end of 2023, the housing and communal services department plans to repair 18 of the simplest shelters.
In October 2023 , NikVesti reported that the department of architecture of the Mykolaiv RMA concluded 27 direct contracts for the development of design and estimate documentation and the carrying out of major repairs of public sector institutions with the company «Architectural bureau — Khvylia 89» LLC, which has been in existence for less than six months, within a month and belongs to a member of the public council of the region on restoration issues. Later, the Mykolayivska OVA explained that direct contracts for the design of shelters with this firm made it possible to save the budget.
Read the article NikVesti «Renovation at the end of the year: who got contracts for the shelter in Mykolaiv without a competition»
Recent news about: Tender