• Friday

    5 December, 2025

  • 4.4°
    Overcast

    Mykolaiv

  • 5 December , 2025 Friday

  • Mykolaiv • 4.4° Overcast

Zaporizhzhia NPP restores access to backup power for the first time in six months

Запорізька АЕС вперше за шість місяців відновила резервне живлення. Фото: ЕРАZaporizhzhia NPP restored backup power for the first time in six months. Photo: ERA

Zaporizhzhia NPP has restored backup power from the grid for the first time in six months after the repair of the second power line.

This was reported by the IAEA press service.

The 330 kV line «Ferrosplavna-1» was connected to the plant, which was an important step in preventing a nuclear disaster.

i Support those who keep the city informed every day

Club NikVesti — a place where the reader and the editorial team are on the same side.

Members have access to a private chat, an exclusive newsletter with behind-the-scenes stories from journalists, see the news earlier, and influence the changes.

Join us. Together we keep the city bright

lock icon Secure payment

The recipient of donations is the NGO “Mykolaiv Media Hub” (EDRPOU 45160758). By making a donation, you confirm that the amount is non-refundable and may be used by the NGO to implement its statutory activities, including supporting independent journalism and creating socially significant content. Public offer.

«The repairs took place through an active war zone, so we had to negotiate a temporary ceasefire for the safe work of technicians. The plant now has access to two power lines again,» IAEA Director General Grossi said.

The repair work began after the area about three kilometres from the station's perimeter was cleared of mines. The damaged cable between the towers was repaired, and the IAEA monitored the process. The line, which had been disconnected since 7 May, was reconnected the same evening.

The restoration of the backup power supply increases the safety of ZNPP and the stability of its operation.

As a reminder, a localised ceasefire was declared near the temporarily occupied Zaporizhzhia NPP on 7 November to repair the 330-kilovolt backup power line that supplied the plant.

Advertising

Read more:

0
Discussion

To join the conversation, please to the NikVesti website.